Post-harvest Leaching Fractions to Manage Soil Salinity

Drought years are tough. Limited water supplies create several challenges that impact the current and future year’s crop. Several articles have been constructed to help manage almond orchards with limited water supplies, but as harvest starts, focus needs to shift to post-harvest management of the orchards.Many orchards relied on groundwater at some point through this year. This may have been sourced directly from a well on the property, or from wells within an irrigation district. Groundwater often contains elevated levels of salt, in particular sodium and chloride. These salts accumulate in the soil from the irrigations that occur during the season. Due to almond roots generally excluding salts, salt levels within the soil could climb as high as 10-15 times the concentration of the irrigation water within a single season. These higher levels of salt will impact growth and productivity as well as lead to tissue toxicity and leaf loss.To manage these salts, they need to be removed from the active rootzone of the tree. Salinity management for various soil types have been described previously for sandy and finer texture soils. These programs rely on winter leaching to reduce the salinity levels within the active rootzone of the tree. This process, however, can be improved by taking actions in the post-harvest to increase soil moisture levels. At this time of year, a leaching fraction should be added to each water applications to increase soil moisture levels. An increase of 15-20% of the irrigation duration should be sufficient. This additional water will refill the soil profile during this period, increasing the effectiveness of leaching by winter rains.The value of applying a leaching fraction in the post-harvest is greater than leaching fractions applied earlier in the season. This is due to the irrigation practices associated with harvest – a time which water applications are reduced. Once water applications are reduced for hull-split and harvest, the tree and soil dynamics will pull the deeper moisture into the rootzone, bringing in the dissolved salts. During the post-harvest, there are no practices that would interfere with the building of stored soil moisture. Furthermore, leaching fractions require less time to apply due to reduced irrigation demand.After refilling the soil profile throughout the fall, additional water may be needed to complete the leaching program. If significant rainfall isn’t received by Christmas, a winter irrigation will be needed. The amount of water depends on the quality of water, the levels of soil salinity, soil type, and irrigation system. After having these variables accounted for, water needs can be estimated more precisely. Based on personal experience, generally, after the profile is filled, about 6-10” of additional water are needed for sandier soils, while 10-15” are needed for loams and clay soils. This water should be applied in 0.5-1” increments, allowing the soil to drain between each irrigation. The amount of rainfall received can be subtracted from these amounts. More on winter leaching programs can be found in this article.

Previous
Previous

Reduced Kernel Size - 2021 Harvest

Next
Next

Preview: Irrigation Management Tech section from the future Almond Production Manual